NEGARIT Intel • ADVANCED OSINT MONITOR
Economy LOW 12 November 2026

Fana Broadcasting: Koysha hydropower project reaches 78.36% completion, EEP reports

Fana Broadcasting (news report; English)
12 November 2026Source: Fana Broadcasting
Share this story
Download share card (PNG)
Share card
Ethiopia's Koysha Hydropower Project, the country's second-largest hydropower development after the Grand Ethiopian Renaissance Dam (GERD), has reached 78.36% completion, Fana Broadcasting reported on November 13, 2026, citing Ethiopian Electric Power (EEP). Located on the Omo River in southwestern Ethiopia, Koysha is designed to generate 1,800 megawatts and produce approximately 6,344 gigawatt-hours annually. EEP reported the progress during its first-quarter performance review for the 2019 Ethiopian fiscal year: 250,000 cubic metres of roller-compacted concrete were placed in the quarter against a planned 255,000, cumulative concrete placement reached 82.29% of the 6.4 million cubic metres required, the dam's left wing stands at 145 metres and the remaining sections average 138 metres against a planned final height of 201.5 metres, and electromechanical work for six turbines is progressing on schedule.
ForecastMy assessment: a low-risk economy item — watch for EEP's next quarterly progress figure, any financing or contractor announcements for the remaining works, and a first-turbine testing date, none of which this report sets.
◈ Deep Analysis ✎ Draft Article
Source: Fana Broadcasting (news report; English)
Share this story
Download share card (PNG)

Read every signal — sign in

Members read the full monitoring feed, free.

🌐 Translation

Translating…